Since becoming an MLA I have visited the proposed location of the Site C dam on the Peace River twice. Most recently, on Aug. 23, I travelled a section of the river with a group of concerned community members. It’s hard to fathom the scale of planned development unless you see it in person, just as it’s hard to grasp the human and cultural cost of this project until you listen to the people caught in the middle of it.
Dam construction would flood more than 5,000 hectares of land – drowning homes, traditional lands, scores of culturally important sites, and 15,985 acres of agricultural land.
Local and indigenous people in the area are being systematically stripped of their livelihood and culture by one arm of government, while receiving apologies for past injustices and promises of reconciliation from another.
Compounding the environmental, historical, cultural and agricultural damages is a reckless disregard of energy economics.
Since 2005, domestic demand for electricity in B.C. has been essentially flat, but over the next 20 years BC Hydro forecasts our energy needs will increase by about 40 per cent as a consequence of both population and economic growth. They are selling Site C as the solution to this growing electricity demand, but their argument doesn’t hold water.
Upon completion, the dam would produce 1,100 MW (megawatts, i.e. millions of Watts) of power capacity and up to 5,100 GWh (gigawatt hours, i.e. billions of watt hours) of electricity each year.
Currently only about 1.5 per cent of B.C.’s electricity production is supplied by wind energy (compared to roughly 20 per cent in P.E.I.). With our mountainous terrain and coastal boundary, the potential for both onshore and offshore wind power production is enormous. The Canadian Wind Energy Association and the BC Hydro Integrated Resource Plan 2013 indicate that 5,100 GWh of wind-generated electricity could be produced in B.C. for about the same price as the electricity to be produced by the Site C dam.
A report by the Canadian Geothermal Energy Association noted B.C. also has substantial untapped potential for firm, on demand, geothermal power which could be developed where power is needed.
While costs associated with Site C will be borne by provincial taxpayers (a price tag that will eventually be much more than BC Hydro’s estimate of roughly $9 billion), solar, wind and geothermal project risks are covered by industry. Alternative sources coupled with existing dams could provide enough energy to meet the needs of British Columbians, with the potential to scale up as needed. They would also provide better economic opportunities to local communities and First Nations across the province, with lower impacts on traditional territories.
Instead of a diversified approach to renewable energy, the B.C. government is pushing Site C because they want to offer LNG proponents access to firm power. As I have been explaining for years, however, there will be no B.C. LNG industry in the foreseeable future because of a global glut in natural gas and plummeting prices for imported LNG in Asia. As the government desperately doubles down on LNG, renewable projects are moving elsewhere. Just this year they let a $750 million US investment to build wind capacity on Vancouver Island slip away, despite buy-in from five First Nations, TimberWest, EDP Renewables and the Canadian Wind Energy Association.
I wanted to see how much has been done when I visited Site C this summer. Nothing has passed a point of no return. Proceeding with Site C is actively driving clean energy investment out of the province, but it is not too late to correct our province’s power trajectory.
Today I had the distinct honour of standing with the Musgamagw Dzawada’enuxw Nation in demanding the removal of open net fish farms from their traditional territories. I went one step further in stating that a BC Green government would ensure that those holding permits for open net fish farming along the migratory route of wild sockeye salmon would be given 90 days notice that their permits would be revoked. In addition, and unlike both the BC NDP and the BC Liberals, the BC Greens will not accept corporate donations from those involved in the open-net Atlantic Salmon farming industry,.
It’s not that the Musgamagw Dzawada’enuxw Nation and I are alone. In May 2015 I introduced a petition by 108,848 people who asked the government to please not issue licenses of occupation to salmon farms trying to expand in British Columbia. I also introduced a second petition signed by more than 100 business organizations across the province who supported the individuals who signed the larger petition. The business organizations argued that they are convinced by the published scientific evidence that open net salmon farms are a threat to B.C. wild pacific salmon.
This doesn’t mean that we have to shut down salmon farming. Rather, it means that we have to start using closed containment systems that pose no threat to our wild salmon. In fact, we need look no further than the Namgis First Nation on Vancouver Island who have initiated a sustainable land-based salmon farming industry on their traditional lands.
The community of Valemount is located on Southern Yellowhead Highway 5, twenty kilometres south of the intersection with Yellowhead Highway 16 that connects Prince George to Edmonton. With a population (including the surrounding area) of about 2000, Valemount, like so many other rural communities in BC, used to have a forestry-based economy. In the case of Valemount, it was the Slocan mill that was the engine of their local economy. But that mill shut down for good over a decade ago.
The people of Valemount and their elected Mayor and Council were resilient. Today Valemount has emerged as a tourism centre in northeastern British Columbia. And it’s about to get a whole lot more exciting.
Valemount is a natural hub for ecotourism. It is a fully serviced community sitting next to Jasper National Park and Mount Robson Provincial Park. It’s also located near the head of Kinbasket Lake, created when BC Hydro’s Mica Dam was built on the Canoe River. Canoe river is the northernmost tributary within the Columbia River drainage basin. McLennan river, one of the easternmost tributaries of the Fraser River also flows along the northern edge of Valemount.
Whether it be skiing or snowshoeing in the winter or white water rafting, fishing, hiking or even golfing in the summer, Valemount has a diverse array of outdoor activities for the young and old. The town’s push to become an ecotourism hub even extends to the town’s high school, home to about 75 students. In 2012, the school became branded as a “mountain school”. The school developed curriculum and learning resources and activities involving outdoor and environmental themes in an attempt to arrest declining enrollment in the area.
Over the last few months I became more and more intrigued about the proposed Valemount Glacier Destination year round ski and sightseeing resort.
On Friday last week, shortly before meeting to learn more from key executives in the Pheidias group, Valemount Glacier Destination’s project proponent, I also met with Gord Stewart, Senior Vice President, and Philip Hochstein, President, of the Independent Contractors and Businesses Association of BC (ICBA). As noted on their website:
“The Independent Contractors and Businesses Association of B.C. services and represents B.C.’s construction sector. ICBA’s 1,100 members build in the multi-family residential and Industrial, Commercial and Institutional (ICI) construction sectors and are involved in virtually all major capital projects in British Columbia.“
The purpose of my visit to the ICBA was to connect with Mr. Hochstein about his work with the ICBA and to learn more about the objectives and priorities of the ICBA and its member organizations. Our conversation centred around responsible resource development. The discussion was far reaching. I emphasized the need for bottom-up project development that starts with community involvement from day one, businesses internalizing externalities, and government clearly outlining and enforcing the regulatory environment and ensuring compliance with it. We both agreed that the construction industry recognizes that project development must be done responsibly. Mr. Hochstein’s challenge to me, a challenge that I accepted, was to define for him what “responsibly” means. I will be working on that in the weeks ahead.
This is an important challenge since in British Columbia, it seems like it is impossible for any resource project to move forward without meeting substantive resistance. In a forthcoming piece I will outline a number of key reasons why I perceive this to be the case as well as solutions as to how we might collectively move forward. The number one reason in my forthcoming post is this:
So what has this got to do with Valemount Glacier Destination — absolutely everything. Some of you might have been following the controversy surrounding a proposed ski development at Jumbo Glacier. Not only was the nearby town of Invermere opposed to the project, but so were the Ktunaxa Nation who ended up in the Supreme Court. But in every failure is the birth of a new opportunity and that is what is playing out now in Valemount.
In a rare example of community-driven success, the genesis of the entire project was actually a phone call from a small citizen delegation authorized by the mayor and council of Valemount in 2011. The phone call was a simple request that Oberto Oberti, distinguished architect and president of the Pheidias Group, consider a proposal similar to what was proposed in the Jumbo Valley for the Valemount area. The Valemount delegation (which would go on to form the Valemount Ski Society), outlined how a project with good elevations (over 3000m), summer skiing on glaciers, as well as world-class year-round sight seeing could be achieved in the immediate area around Valemount, but better still, without the construction of significant new roads into remote valleys. In short, a world-class high alpine development could be achieved in the front country of the Robson Valley, in a busier highway, with a more exclusive existing market-base (Edmonton and Jasper) as opposed to the more competitive market base of Calgary, Banff and the Kootenays. A project in Valemount would also be located very close to, but not within the UNESCO World Heritage Sites of Mt. Robson Provincial, and Jasper National Parks. Oberto Oberti’s first action after receiving the phone call was to arrange a meeting with the Simpcw Nation. The resulting collaboration of local support has survived three changes in Mayor and Council at both the municipality of Valemount and the Simpcw First Nation and no organized opposition has yet to come forward against the project.
After some initial seed money to achieve a Master Development Agreement, a small group of Vancouver based investors who founded Valemount Glacier Destinations Ltd. was joined by Greg Marchant and Hunter Milborne of a larger Toronto investment community. As such, a very rare kind of project has emerged in which a small town joined forces with the local First Nation, solicited expertise from Vancouver, and will build Phase One entirely with no real estate pre-sales with Canadian investment. The undertones of Nation Building can not be denied in this aligning of forces. The Canadian investors are already lined up to make this project a reality and open for skiing by the time the 2017/18 ski season gets underway. But of course, that’s only if the BC government will give its final approval.
So what’s special about this project. I encourage you to see for yourself by browsing through the 325 page Master Plan. In particular, have a look at Appendix 3, Valemount Resort Environmental Impact Assessment put together by Vancouver-based Enkon Environmental Limited. I’ve seen a number of Environmental Assessments over the years and this one strikes me as a particularly fine example of what can be done.
The Pheidias Group have a vision for an environmentally sensitive year round ecotourism resort that will provide visitors to British Columbia with another destination rivaling that of Whister-Blackcomb. It will give visitors stunning views of Mount Robson, the highest mountain in the Canadian Rockies. The peak elevation of the site is on Mt. Arthur Meighen (3,205 metres). Compare this to the peak elevations at Whistler (2,240m), Blackcomb (2,440m), Sun Peaks (2,080m), Mount Washington (1,588m), and Big White (2,319). The high peak elevation is such that skiing on glaciers will likely be year round for quite some time to come. In addition, this elevation, coupled with a more northerly location bodes well for long term operations in light of ongoing global warming and the increased likelihood of more precipitation at lower elevations and latitudes in the form of rain instead of snow in the years ahead. What’s more, the resort has the potential to be carbon neutral by tapping into the nearby 5.7 MW Hystad Creek small scale hydro project. There’s also incredible geothermal energy potential in the region.
After meeting with the Pheidias Group, peppering them with questions, taking copious notes, and subsequently reading the Master Plan, it’s clear to me that this is an exciting project that I am keen to see move forward. So what’s the delay?
The irony is that for a government so proud of touting the “let’s get to yes” mantra and so chuffed with itself for proclaiming in law that the first Wednesday in March is “Red Tape Reduction Day“, the delay falls squarely in the realm of government red tape precluding the project from getting to yes.
The project is six months behind and the latest layer of red tape is a bizarre new requirement for a four lane 80 km/hr highway to take skiers on an 8km journey from Valemount to the Resort Base village.
Valemount Glacier Destination is an ecologically sensitive project that will provide an incredible economic stimulus to northeastern BC. In the words of Oberto Oberti, President of the Pheidias Group, “We want to work with nature, not against nature”.
If the BC government spent a fraction of the energy they are spending in a desperate attempt to land a hypothetical LNG facility on actually moving real projects forward, we would be leading North America in the development of a 21st century diversified economy.
The “forces of no” within the BC Liberal government really need to “get to yes” in a timely fashion on this project.
Today in the legislature I introduced Bill M214 — Local Government Amendment Act, 2016.
If passed, this Bill will ensure that municipalities in BC cannot be incorporated without first ensuring that there are residents actually living in the area at the time of incorporation. This might seem like an unnecessary bill as it would seem obvious that a municipality, governed by a Mayor and two Councillors, should actually have people and property to govern. Well that’s not the case in the wild west of British Columbia politics.
Back in 2012, the BC Liberals amended The Local Government Act to allow mountain resort municipalities to be created that have no residents. In particular, this was done in support of the proposed Jumbo Glacier Mountain resort that I have written about earlier.
Given opposition to the resort by the Ktunaxa Nation, the fact that the environmental assessment certificate has expired, and that the project has not substantially started, it seemed timely to close the loophole for good as it sets a dangerous precedence.
Below I reproduce the text and video of my introduction of the Bill. I append our media release at the end.
A. Weaver: I move introduction of the Local Government Amendment Act, 2016.
Motion approved.
A. Weaver: I am pleased to be introducing a bill intituled the Local Government Amendment Act.
In British Columbia, we have a municipality that has no houses, no infrastructure and no people. The Jumbo Glacier Resort is designated as a mountain resort municipality, and despite having neither any people nor any buildings, it is governed by a mayor and two councillors and funded by the province.
For the existence of a municipality to make any sense, it needs people. The Local Government Amendment Act would ensure that this be the case across British Columbia. This bill would close a glaring loophole created in 2012 by this government solely to support a project that has not substantially started. It’s opposed by the Ktunaxa Nation — and whose environmental assessment certificate has expired.
I move that the bill be placed on the orders of the day for second reading at the next sitting of the House after today.
Motion approved.
Bill M214, Local Government Amendment Act, 2016, introduced, read a first time and ordered to be placed on orders of the day for second reading at the next sitting of the House after today.
Media Release: April 6, 2016
Andrew Weaver – Municipalities in B.C. should not be created without people.
For Immediate Release
Victoria B.C. – Andrew Weaver, Leader of the B.C. Green Party and MLA for Oak Bay-Gordon Head, today introduced a Bill that would ensure municipalities could not be created unless there were people actually living in the area first.
“Normally you might assume that you would need to have people living in an area before you could form a municipality,” says Weaver. “That was the case in B.C. until the government made an exception a few years ago. In 2012 the government introduced a loophole that allowed Mountain Resort Municipalities to exist without any residents.”
Today Andrew Weaver introduced the Local Government Amendment Act, 2016. It is a bill designed to repeal the changes made in 2012 to the Local Government Act under the B.C. Liberals.
“The whole reason this ridiculous loophole exists in the first place is because this government has a pet project that it wanted to succeed, despite huge opposition from the local community and First Nations,” says Weaver. “Now a municipality exists that has no people, and to top it off it also has a mayor and councillors and the whole system is being funded by the British Columbian taxpayer. It’s an absurd situation and the bill I introduced today would close that loophole.”
“The approach to the Jumbo fiasco reminds me of how this government approached the Petronas deal last year. Not only are they choosing winners in the economy, they’re creating laws specific to helping those projects succeed. The laws of this province should not be used to help specific projects succeed or fail.”
Media Contact
Mat Wright – Press Secretary Andrew Weaver MLA
1 250 216 3382
mat.wright@leg.bc.ca
Today I was in Vancouver meeting with a number of business leaders in British Columbia’s creative economy. My colleague Matt Toner (Deputy Leader of the BC Green Party) and I took the opportunity to visit with opponents of the proposed Site C dam who were camped out in front of BC Hydro’s downtown Vancouver headquarters. It quickly became apparent to me that what is happening there qualifies as perhaps the most under-reported story of 2016.
Those who have been following my work over the last few years will know that I have frequently spoken out against the reckless disregard of energy economics exhibited by the BC Liberals.
Whether it be the fiscal folly of moving forward with Site C, the risking of British Columbia’s triple-A credit rating, or the lost opportunities arising from proceeding with Site C (including geothermal or wind), I have been arguing for almost three years now that proceeding with Site C makes no economic sense.
Let’s be clear. The BC Liberals are moving forward with the construction of the Site C dam exclusively because they want to ensure that LNG proponents have access to firm power so that they might use electricity-driven compressors in their liquefaction process (the so-called “cleanest LNG in the world”). For example, on November 4, 2014, BC Hydro and LNG Canada signed a power agreement that ensured taxpayer-subsidized power for the LNG industry in BC. But of course, as I have been pointing out for more than three years now, there will be no LNG industry anytime soon in BC due to the global glut in natural gas and plummeting prices for landed LNG in Asia.
As the BC Government strives to “Get to Yes” on an electricity generation project that no longer has any buyers, they have turned to Alberta. Yet Alberta has said they are not interested in buying BC’s excess electricity and the Trudeau government pointedly excluded funding for BC-to-Alberta transmission line infrastructure in the 2016 budget.
While the shenanigans of our political leaders in British Columbia play out, a remarkable young woman, Kristen Henry, has stepped up to draw attention to the negative consequences of moving forward with Site C.
I had the distinct honour of meeting with Kristin today. Kristin is in the 11th day of a hunger strike against the Site C dam. Stop and think about this for a minute. Can you imagine eleven days without food? Have you heard about this in the local media? I suspect not.
Kristin is an articulate, passionate and highly educated young woman who has literally put her life on the line in an attempt to draw attention to the reckless folly of proceeding with Site C. She is extremely concerned about Site C’s violation of indigenous treaty rights, its effect on food security, and its reckless economics. While the mainstream media may not have drawn attention to her remarkable achievements, rest assured, her efforts have had a profound impact on me.